Host a change-order form that files each request and sends it from your address
Published 2026-09-17
A change comes up on the job: a different fixture, a longer run of trim, a wall that was not in the scope. You need a form the client or the crew can fill, and you need that change on the job, not only in a text message.
Yes, ChatGPT Sites can host that form now. It can publish the page, check required fields, and save each submission in a database, with attachments if you ask. For a list of requests you review by hand, that is enough.
The gap is filing the change on the job, and sending it for a yes, when the form is submitted.
The gap that remains
Sites does not run background services. Nothing puts the request next to the job files, nothing mails the client a copy, and nothing asks for a signature or a yes. A scheduled task can remind you to look at new rows, but each run wakes a model, and a send may wait on your approval. The Site has no mail address of its own.
Pasting a third-party form link into the chat is still you running change orders somewhere else, with no connection to the job folder or the inbox.
What your assistant builds with Sails
Sails is a coding agent you connect over MCP, with cloud deployment built in. Your assistant writes the code and Sails runs it in the cloud. For change orders it builds three pieces.
A form on a URL. Each submit becomes a row on the job: what changed, the cost if you have it, who asked, and whether it is approved. The files for that job sit next to the row.
A mailbox. A copy can go to the client from your assistant's address, and their yes or no comes back to that inbox, on that row. You can hold the send for a draft if you want to read it first.
A job that runs when a submission arrives. It is ordinary shell code. It files the row, saves any upload, and prepares or sends the notice. There is no model in the loop. The form keeps working while ChatGPT is closed.
Why it works
A change order only helps if it is on the job and if everyone sees the same request. Because the form, the table, the files, and the inbox share one workspace, a later chat can open the job and see every change, including the reply. You do not reconstruct the extra work from a thread. The client has an address to write back to, and the crew has a list.
Hand it off
Copy this into your assistant:
Add Sails from https://sails.app/start. Host a change-order form on my site. Save each submission on the job it belongs to, including any upload. When one lands, file the row and send a copy from a Sails inbox, or leave a draft if I want to read it first. The on-submit job should be plain shell code with no model involved. Show me the form URL and one sample row when it is done. Ask me anything you need before you start.